Bug Fixes
FACTON EPC 9 SC FP2
N/A
Known Issues
- #44998: Cost Model Deep Drawing: A Consistency Rule checks whether the Machine has at least the required number of Press Stations. This Consistency Rule is also violated if the number of available Press Stations equals the number of required Press Stations.
- #45031: When copying a Process with »Sintering« as the chosen Cost Model of an Assembly "Mass" into a Production Line, the Production Costs of the Process are displayed as #INVALID#.
FACTON EPC 9 SC FP1
- After bug fixes, the calculation elements Process, Setup Process, Material and Should Cost Calculation are provided with updated modes.
- Modes that are already used in previous calculations are then identified as "outdated" and are not available for new calculations anymore. Outdated modes of previous calculations can be updated manually.
Known Issues
- #44998: Cost Model Deep Drawing: A Consistency Rule checks whether the Machine has at least the required number of Press Stations. This Consistency Rule is also violated if the number of available Press Stations equals the number of required Press Stations.
- #45031: When copying a Process with »Sintering« as the chosen Cost Model of an Assembly "Mass" into a Production Line, the Production Costs of the Process are displayed as #INVALID#.
FACTON EPC 9 SC
N/A
Known Issues
- #31476: If the relevant quantity of an assembly or part does not equal "1", some cost types (e.g. direct material costs, material overhead costs) at the assembly or part are not shown multiplied by this relevant quantity. The value multiplied by the relevant quantity is only first shown on the superordinate assembly or the target cost calculation.