Other enhancements
- The Overhead Rate basis for Administration, Sales, Development, and Logistics of each calculation can be set to ManC II or ProdC.
- Calculations can be assigned to clients informatively by setting the client name in the Should Cost Calculation level.
- Now, calculations can also be found via the client.
- The basis for calculating the Manufacturing Overhead Cost has changed from »Labor Cost« to »Labor Cost, Labor Setup Cost, Machine Cost, Machine Setup Cost, Manufacturing Scrap«.
- The basis for calculating the Manufacturing Scrap has changed from »Labor Cost, Machine Cost, Manufacturing Overhead Cost« to »Labor Cost, Machine Cost«.
- Machines that are not supported anymore, i.e. that are expired, are shown in a Consistency Rule.